Shipping
Moving equipment from a closing facility
Factory and warehouse closures can involve multiple machines, loading crews, riggers, trucks, and fixed deadlines. The transportation plan should inventory each item and coordinate removal, pickup, securement, and destination requirements.
A simple closure logistics sequence
Start with an asset register: one record per machine or handling unit, including location inside the facility and its removal readiness. Group items by destination, access route, required equipment, and pickup window. Then schedule qualified riggers and suitable carriers around the actual order equipment becomes available, rather than asking trucks to arrive before material is prepared.
What to check
- Inventory every asset with photos, dimensions, weight, and destination.
- Confirm decommissioning, disconnection, and safe removal responsibilities.
- Identify dock, door, overhead, floor-loading, crane, and forklift constraints.
Operational caution: machine isolation, lifting, securement, and oversize permitting require qualified professionals. This guide is a transportation-planning aid, not a rigging or safety procedure.